Prestressed concrete






Prestressed concrete is a method for overcoming concrete's natural weakness in tension. It can be used to produce beams, floors or bridges with a longer span than is practical with ordinary reinforced concrete. Prestressing tendons (generally of high tensile steel cable or rods) are used to provide a clamping load which produces a compressive stress that balances the tensile stress that the concrete compression member would otherwise experience due to a bending load. Traditional reinforced concrete is based on the use of steel reinforcement bars, rebars, inside poured concrete.



Prestressing can be accomplished in three ways: pre-tensioned concrete, and bonded or unbonded post-tensioned concrete.

 

Pre-tensioned concrete

Pre-tensioned concrete is cast around already tensioned tendons. This method produces a good bond between the tendon and concrete, which both protects the tendon from corrosion and allows for direct transfer of tension. The cured concrete adheres and bonds to the bars and when the tension is released it is transferred to the concrete as compression by static friction. However, it requires stout anchoring points between which the tendon is to be stretched and the tendons are usually in a straight line. Thus, most pretensioned concrete elements are prefabricated in a factory and must be transported to the construction site, which limits their size. Pre-tensioned elements may be balcony elements, lintrls, floor slabs, beams or foundation piles. An innovative bridge construction method using pre-stressing is the stressed ribbon bridge design.

Bonded post-tensioned concrete

Bonded post-tensioned concrete is the descriptive term for a method of applying compression after pouring concrete and the curing process (in situ). The concrete is cast around a plastic, steel or aluminium curved duct, to follow the area where otherwise tension would occur in the concrete element. A set of tendons are fished through the duct and the concrete is poured. Once the concrete has hardened, the tendons are tensioned by hydraulic jacks that react (push) against the concrete member itself. When the tendons have stretched sufficiently, according to the design specifications (see Hooke's law), they are wedged in position and maintain tension after the jacks are removed, transferring pressure to the concrete. The duct is then grouted to protect the tendons from corrosion. This method is commonly used to create monolithic slabs for house construction in locations where expansive soils (such as adobe clay) create problems for the typical perimeter foundation. All stresses from seasonal expansion and contraction of the underlying soil are taken into the entire tensioned slab, which supports the building without significant flexure. Post-tensioning is also used in the construction of various bridges, both after concrete is cured after support by falsework and by the assembly of prefabricated sections, as in the segmental bridge.The advantages of this system over unbonded post-tensioning are:
  1. Large reduction in traditional reinforcement requirements as tendons cannot destress in accidents
  2. Tendons can be easily "woven" allowing a more efficient design approach
  3. Higher ultimate strength due to bond generated between the strand and concrete.
  4. No long term issues with maintaining the integrity of the anchor/dead end.

Unbonded post-tensioned concrete

Unbonded post-tensioned concrete differs from bonded post-tensioning by providing each individual cable permanent freedom of movement relative to the concrete. To achieve this, each individual tendon is coated with a grease (generally lithium based) and covered by a plastic sheathing formed in an extrusion process. The transfer of tension to the concrete is achieved by the steel cable acting against steel anchors embedded in the perimeter of the slab. The main disadvantage over bonded post-tensioning is the fact that a cable can destress itself and burst out of the slab if damaged (such as during repair on the slab). The advantages of this system over bonded post-tensioning are:
  1. The ability to individually adjust cables based on poor field conditions (For example: shifting a group of 4 cables around an opening by placing 2 to either side).
  2. The procedure of post-stress grouting is eliminated.
  3. The ability to de-stress the tendons before attempting repair work.
Picture number one (below) shows rolls of post-tensioning (PT) cables with the holding end anchors displayed. The holding end anchors are fastened to rebar placed above and below the cable and buried in the concrete locking that end. Pictures numbered two, three and four shows a series of black pulling end anchors from the rear along the floor edge form. Rebar is placed above and below the cable both in front and behind the face of the pulling end anchor. The above and below placement of the rebar can be seen in picture number three and the placement of the rebar in front and behind can be seen in picture number four. The blue cable seen in picture number four is electrical conduit. Picture number five shows the plastic sheathing stripped from the ends of the post-tensioning cables before placement through the pulling end anchors. Picture number six shows the post-tensioning cables in place for concrete pouring. The plastic sheathing has been removed from the end of the cable and the cable has been pushed through the black pulling end anchor attached to the inside of the concrete floor side form. The greased cable can be seen protruding from the concrete floor side form. Pictures seven and eight show the post-tensioning cables protruding from the poured concrete floor. After the concrete floor has been poured and has set for about a week, the cable ends will be pulled with a hydraulic jack.

Engineering Resume Tips

 



The engineering resume is the engineering job seeker’s primary marketing document that sells the product – the skills and experience of the engineer. Engineering resumes can be a more difficult document to develop than a regular resume, especially because engineering jobs are often technical while those doing the hiring are not. Most engineers can get the basics of their past projects and experiences down on paper in a chronological and sensible fashion.
An engineering resume should clearly show a candidate’s technical skills. To achieve this, add the Technical Summary or Technical Expertise section to your resume. Further break this section into subcategories for a quick scan of your knowledge of programs and applications. When writing a resume for a highly technical position like engineering, a full range of your technical skills needs to be highlighted. Transferable skills such as departmental coordination and project management should also be included in order to create a powerful engineer job resume.
Follows are several essential tips for best engineering resumes:
1. Organizational format. Most resumes are written in chronological  format, but that does not mean that the chronological choice is best for you. A combination format may be best. The combination format is evenly balanced between skill set description, achievements, and employment history, with the advantage being that projects can be highlighted for greater impact.
2. Details. Employers want to see the details of your engineering work history and experience, but they don’t need your life story. Keep information specific to the job and with one goal in mind – getting an interview. That means anything that you have done in past jobs that is not relevant to this job in any way is just filler.
3. No errors. Make absolutely sure your document is error free. An error in a resume can often be the killer between two closely matched candidates. Engineers are expected to be detail-oriented so an error in the engineering resume reflects badly on possible future performance.
4. Find a balance between wordiness and lack of detail. Employers need to see details about your work history and engineering experience, but they don’t need to know everything. The fact that you were Den Leader in your Cub Scout troop is irrelevant. Keep information germane to the goal of attaining an interview.
5. Think “accomplishments” rather than “job duties”. What made you stand out from the crowd? How did you come up with a way to do things better, more efficiently, or for less cost? What won honors for you? Information such as this will be what makes you grab attention and put your engineering resume on the top of the stack.