Construction surveying is generally
performed by specialised technicians. Unlike land surveyors, the
resulting plan does not have legal status. Construction surveyors
perform the following tasks:
- Survey existing conditions of the future work site, including topography, existing buildings and infrastructure, and even including underground infrastructure whenever possible (for example, measuring invert elevations and diameters of sewers at manholes);
- Construction surveying (otherwise “lay-out” or “setting-out”): to stake out reference points and markers that will guide the construction of new structures such as roads or buildings for subsequent construction. These markers are usually staked out according to the arbitrary coordinate system used for the project;
- Verify the location of structures during construction;
- As-Built surveying: a survey conducted at the end of the construction project to verify that the work authorized was completed to the specifications set on plans.
“Coordinate Systems used in Construction”
Land surveys and surveys of existing
conditions are generally performed according to [geodesic] coordinates.
However for the purposes of construction an arbitrary construction
coordinate system will often be used. During construction surveying, the
surveyor will often have to convert from geodesic coordinates to the
arbitrary coordinate system used for that project.
In the case of roads or other linear
[infrastructure], a “chainage” will be established, often to correspond
with the center line of the road. During construction, structures would
then be located in terms of “chainage”, “offset” and “elevation”.
“Offset” is said to be “left” or “right” relative to someone standing on
the “chainage line” who is looking in the direction of increasing
“chainage”. Plans would often show “plan” views (viewed from above),
“profile” views (a “transparent” section view collapsing all section
views of the road parallel to the “chainage”) or “cross-section” views
(a “true” section view perpendicular to the “chainage”). In a “plan”
view, “chainage” generally increases from left to right, or from the
bottom to the top of the plan. “Profiles” are shown with the chainage
increasing from left to right, and “cross-sections” are shown as if the
viewer is looking in the direction of increasing chainage (so that the “left” “offset” is to the “left” and the “right” “offset” is to the “right”).
“Building Axes”
In the case of buildings, an arbitrary
system of axes is often established so as to correspond to the rows of
columns and the major load-bearing walls of the building. The axes may
be identified alphabetically in one direction, and numerically in the
other direction (as in a road map). The axes are usually but not
necessarily perpendicular, and are often but not necessarily evenly
spaced. Floors and basement levels are also numbered. Structures,
equipment or architectural details may be located in reference to the
floor and the nearest intersection of the arbitrary axes.
“Reference Lines”
In other types of construction projects,
arbitrary “north-south” and “east-west” reference lines may be
established, that do not necessarily correspond to true coordinates.
There are many different types of land surveys. Residential land surveys are among the most common, and are the type of survey most likely to be encountered by the general public.
ReplyDeleteLand Surveying Service
This comment has been removed by the author.
ReplyDeletewow....ur blog post is very nice .it is the most attracting blog side .the Construction Surveying is a most common service of Real Estate..thanku for sharing this.......
ReplyDeleteConstruction Surveyors Virginia